CH-640 Fuselage Hull - Stage One - Part Two (178 of 198)




I had to drill the rivets out of my baggage area AGAIN to do this, but I really wanted these steps so here we go.  Measure 155 mm back from the front of the front access door Z.  This is the location of the front of the floor stiffener.  measure 45mm from the fuselage skin, this is the center of the 7\8
I had to drill the rivets out of my baggage area AGAIN to do this, but I really wanted these steps so here we go. Measure 155 mm back from the front of the front access door Z. This is the location of the front of the floor stiffener. measure 45mm from the fuselage skin, this is the center of the 7\8" hole in the floor stiffener.