CH-640 Fuselage Hull - Stage One - Part Two (177 of 198)




These are the parts needed to install the optional steps.  20-E-15-1 (left step) 20-E-15-4 (right step) 20-E-15-2 (left floor stiffener) 20-E-15-5 (right floor stiffener) 20-E-15-3 (left upper pivoting bracket) 20-E-15-6 (right upper pivoting bracket).  You will also need 2 AN3-13A bolts, 2 AN960-10 washers, and 2 AN365-1032 nuts.
These are the parts needed to install the optional steps. 20-E-15-1 (left step) 20-E-15-4 (right step) 20-E-15-2 (left floor stiffener) 20-E-15-5 (right floor stiffener) 20-E-15-3 (left upper pivoting bracket) 20-E-15-6 (right upper pivoting bracket). You will also need 2 AN3-13A bolts, 2 AN960-10 washers, and 2 AN365-1032 nuts.