CH-640 Fuselage Hull - Stage One - Part Two (27 of 198)




Trim 640-F-42-1 (Horizontal stiffener) to fit behind bulkhead 3 on top of the top longerons.  Drill and cleco in position A4 P40.
Trim 640-F-42-1 (Horizontal stiffener) to fit behind bulkhead 3 on top of the top longerons. Drill and cleco in position A4 P40.