CH-640 Fuselage Front Z and torque tube tunnel (3 of 70)
Clamp the side wall to the forward Z, drill and cleco in place. Be sure that you line up the top and the bottom of the side walls to be flush with the top and bottom of the Z. Repeat for the other side wall.