CH-640 Fuselage Front Z and torque tube tunnel (2 of 70)




Position 20-F-15-2 (torque tube support side wall) to the forward Z and draw a line to mark the edge of it's flange.  Mark and drill  8 A5 rivet holes P31 for both the left and right supports.
Position 20-F-15-2 (torque tube support side wall) to the forward Z and draw a line to mark the edge of it's flange. Mark and drill 8 A5 rivet holes P31 for both the left and right supports.