CH-640 Fuselage Hull - Stage One - Part Two (142 of 198)




Install 20-C-15-2 (flap sector) between the short and long flap levers.  By the way, what the heck is a flap sector?  I'd just call it a flap arm or something like that.
Install 20-C-15-2 (flap sector) between the short and long flap levers. By the way, what the heck is a flap sector? I'd just call it a flap arm or something like that.