CH-640 Fuselage Hull - Stage One - Part Two (46 of 198)




Cleco bulkhead 3 to the fuselage and rivet the baggage floor to the bulkhead.  I am not going to rivet the skin to this bulkhead at this time since there will be another skin that overlaps this and I would think that you would want to rivet them both at the same time.
Cleco bulkhead 3 to the fuselage and rivet the baggage floor to the bulkhead. I am not going to rivet the skin to this bulkhead at this time since there will be another skin that overlaps this and I would think that you would want to rivet them both at the same time.